Position: Home / Our Services / Laboratory Technical Services /Supervision and acceptance of laboratory construction
Supervision and acceptance of laboratory construction

Because some laboratories are difficult to find defects after decoration and construction, Huabi Laboratory Technical Services Department, in compiling the design scheme, according to experience, specially set such problems as phase acceptance nodes to avoid quality out of control due to missing key quality control points.

FALAB service:The acceptance criteria for laboratories in different fields are established according to the standards, and the acceptance criteria for laboratories in terms of standardization, safety and reliability are comprehensively checked to ensure that the laboratories meet the requirements of fire protection, environmental protection and relevant accreditation and certification standards.

 

FALAB advantages:The Technical Service Department of Huabi Laboratory dispatches professional project engineers and CNAS reviewers for acceptance of the project in line with the purpose of concentrating, concentrating and specializing.